We were engaged to support Arden with a new campus in Manchester. 2 buildings had been short-listed for evaluation and our role was to provide a feasibility study and to manage the construction through to completion. A brief taking workshop started the process off and confirmed a need for 45 classrooms, several computer labs, study areas, breakout spaces and staff meeting rooms.
The site at 2 Hardman Street was selected as it was of newer construction, would require fewer mechanical alterations and offered better layout options. The building was however designed for lower occupancy rates, so did require additional toilets to support the 1500 students expected onsite.
After space plans had been agreed we created an architectural performance specification to support the layouts, and an external consultant provided the same for the M&E. These were all used to inform a Design and Build tender. Each tenderer developed their own design and provided detail cost breakdowns for approval, these were carefully interrogated prior to presenting to the client team. Loop were selected as the successful contractor with a design that was both welcoming and on brand